Case study - St Andrews Links Trust

Download PDF document PDF(344 Kb)

Our solution: LC500 Load Compensation Unit
Site: Eden Clubhouse, St Andrews Links Trust
Energy type: Natural Gas
Trial No. 01 date: 12th November - 30th November 2009
Trial No. 02 date: 06th December - 20th December 2009
Trialed on: 2 Wessex 70 Gas-fired boilers
Results: 15.04% and 18.73% savings in Gas consumption

The trials were undertaken at Eden Club House under the supervision of Property Manager Mike Horkan on 2 Wessex 70 gas-fired boilers which provide room space heating for the club house.

Two LC500C controls with integral hours run meters were fitted to the boilers and the burn activity was recorded daily with the units on and offline on alternate days. Two trial periods were recorded: 12th Nov - 30th Nov and 6th Dec - 20th Dec as shown below.

Result from trials at the Eden Club House.

Result from trials at the Eden Club House.

Savings recorded during these trials were 15.04% and 18.73% respectively. It is estimated that the costs will be recovered in under 18 months. Apart from this financial saving, the savings also represent substantial reductions in greenhouse gases CO and CH .